top of page
Search

Our finished prototype!

  • Writer: FYDP Group 35
    FYDP Group 35
  • Mar 9, 2022
  • 1 min read

Once the electrical and mechanical components were all assembled and integrated within the crutch, it was tested under its use cases to ensure all of the desired requirements were met. This included the crutch automatically being able to detect when it was left alone as well as the option to toggle between manual/automatic modes.


Video - automatic functionalities



Video - manual functionalities



 
 
 

Recent Posts

See All
Future Improvements

Upon reflection of our project following symposium, we determined a few main areas of improvement that could be implemented in a...

 
 
 
Crutch Updates

Several changes were made to the crutch. An issue that was encountered when assembling was that the method for attaching the leg system...

 
 
 
Electronics housing

A final step in the mechanical prototype process was to design boxes to hold the various electronic components. Specifically, boxes were...

 
 
 

Comments


bottom of page